Joomla RuleZ

  • Increase font size
  • Default font size
  • Decrease font size
Home CB Player

CB Player Advanced 2.13.0

E-mail Print PDF
User Rating: / 35
PoorBest 

The CB Player Advanced allows you to integrate the JW Player into your community site. It requires the Joomla Community Builder within your Joomla CMS, and permits your users to upload and embed videos within the community site. For example, with this plugin you can grant community site users the permission to create and display their own audio and video playlists within the site. The version of the JW Media Player used is 5.9.

The CB Player Advanced works with Community Builder 1.x , Joomla 1.5 / 1.6 / 1.7 / 2.5 and is HTML5 ready

image

JoomlaRuleZ is an official Reseller of JW.
The license price that we negociate with our partners is the same of Longtail but include all Advanced Version of our Extensions.
By this way you will have an unbranded player, It is not the case of all the other module or plugin using this player that you can find on the JED !!

All LongTail Video products require licenses when used commercially, Examples of commercial use include :

  • Websites with any advertisements
  • Websites owned or operated by corporations
  • Websites designed to promote other products, such as a band or artist
CB Player
CB Player Advanced

Uncommercial Website :
0 € ,
Free Membership :
Register Now

image

image

Version and Compatibility

Name
CB Player
CB Player Advanced
Joomla 1.5.x
image
image
Joomla 1.6.x
Joomla 1.6
Joomla 1.6
Joomla 1.7.x
Joomla 1.7
Joomla 1.7
Joomla 2.5.x
Joomla 2.5
Joomla 2.5
JED, Joomla! Extensions Directory Official Page
imageimage
imageimage
If you use CB Player, please post a rating and a review at the Joomla! Extensions Directory.
image
image
Communauty Builder 1.2.x - 1.8.x
image
image

JW FLV Player 5.9 Official Resseler, Unbranded player !

image

Unbranded Player only available with a License.

image

Unbranded Player only available with a License.

Select JW Player Version (JW 4.x, JW 5.x, JW5.x with Fallback to HTML5, HTML5 with Fallback to JW5.x) and by the way add automatic switch flashvars parameters according to JW version.
JW 5.9.2156
JW 4.7.1128, JW 5.9.2156, HTML5 Fallback, Flash Fallback
HTML5
(!! Only with playlist editor and mp4 / mp3 file or with mRSS playlist !!)
image
image
Version Up-To-Date of the Plugin
2.12.0 (21 April 2012)
2.13.0 (21 April 2012)

Changelog

Supported File Formats

Name
CB Player
CB Player Advanced
External RSS Link - Flash Mode (ASX, ATOM, RSS - iTunes, RSS - Media, SMIL, XSPF)
  • ASX feeds (example)
  • ATOM feeds with Media extensions (example)
  • RSS feeds with iTunes (example) extensions and Media extensions (example).
  • Basic SMIL feeds
  • XSPF feeds (example)
  • Youtube Link and Playlist (example, FAQ), Add thumbnail automatically for youtube video. NEW !! Auto replace youtube playlist link to gdata xml youtube playlist, no longuer need to place the ID within the gdata xml link.
  • YouTube HD content; your YouTube content will now automatically select the optimal quality setting for your player embed.
  • Automated Bitrate Switching (FAQ)
image
image
External RSS Link - Flash and HTML5 Mode ( RSS - Media, M3U8)
  • RSS feeds with Media extensions (example).
  • Playlist in M3U8 (Cupertino Streaming).
image
image
Support Video/Audio Files - Flash Mode (FLV, MP3/MPEG, H.264/MP4, JPG, PNG et GIF)
  • Video Formats: H.264 (.mp4, .mov, .f4v), FLV (.flv), 3GPP (.3gp, .3g2)
  • Sound Formats: AAC (.aac, .m4a), MP3 (.mp3).
  • Image Formats: JPEG (.jpg), PNG (.png), GIF (.gif).
image
image
Support Video/Audio Files - Flash and HTML5 Mode
  • Video Formats*: H.264 / MP4 (.mp4), VP8 / WebM (.webm), Ogg Theora (.ogv).
  • Image Formats: JPEG (.jpg), PNG (.png), GIF (.gif).
  • Sound Formats*: AAC (.aac, .m4a), MP3 (.mp3), Ogg Vorbis (.ogg).
image
image
Support Video Files - Flash Mode
Vimeo Link (only with JW 5.x). (Based on project http://jwplayervimeo.sourceforge.net)
image
image

Language

Name
CB Player
CB Player Advanced

Language - EN

image
image
image

Language - FR

image
image
image

Language - ES

image
image
image

Language - pt-PT

image
image
image

Language - br-PT

image
image
image

Specs User interface

Name
CB Player
CB Player Advanced

RSS Link -Flash (ASX, ATOM, RSS - iTunes, RSS - Media, SMIL, XSPF) and HTML5 (RSS - Media) Mode.

  • Administrator can disallow this function.
image
image

Upload Files - Flash and HTML5 Mode, (This is allow in the Playlist Editor) Need CB Ajax File Field Plugin and CB 1.2.x to 1.4.x :

  • This Allow Upload files for user, this is limit at 5 items by default (can be up to 50) in the playlist editor (stream and thumbnail).
  • The files are store on the server.
  • Administrator can limit size and type for each files.
  • Administrator can disallow this function (don't install the CB Ajax File Field Plugin or unpublish specific field you doesn't want)
  • Administrator always can allow Field remote file(useful for big files, if you don't want to charge too much your server), or not (unpublish Fields).
image
image

Playlist Editor - Flash and HTML5 Mode, 1 to 5 items (5 by defaut can be up to 50) for the Playlist Editor, including settings for each one. :

  • Author (Author of the video, shown in the display or playlist.)
  • Title (Title of the video, shown in the display or playlist.)
  • Image (location of a preview image; shown in display and playlist.)
  • Description (Text description of the file.)
  • Link (Url to an external page the display, controlbar and playlist can link to.), (deprecated for JW5.x).
  • Duration (Duration of the file in seconds.)
  • Auto detect type of file.
  • Upload Files.
Add infinite (50 items...) playlist editor fields support, Note that exact Field name must be use (cb_plfile6, cb_plfileup6, cb_pltitle6, cb_pldesc6, cb_plthumbnail6, cb_plfilethumbnailup6, cb_pllink6 and so one 7,8,9...)
image
image
Skin - User choice for his own Skin
image
image

Preview User interface

Name
CB Player
CB Player Advanced
Preview File Fields
image
image
image
Preview User Tab
image
image
Preview User Profile
image
image

Admin interface

Name
CB Player
CB Player Advanced
Upgrade to swfobject 2.2., Native Template mootools/Jquery compatible.
image
image
Add Load Swfobject Automatic, force to yes, force to no.
image
image
Display or Not Link to Adobe Flash Installer
image
image
Default Display : Display player even user have no playlist
image
image
Default playlist : Display one playlist item even user have no playlist.
image
image
HTML5 Add Load jwplayer.js Automatic, force to yes, force to no.
image
image
HTML5 When using HTML5, activate a Download link failover for players with no native playback mechanism.
image
image
HTML5 Add Load iScroll.js this for html5 playlist scrolling under iOS, Automatic, force to yes, force to no.
image
image
Admin parameters for allow or not user choice for RSS/Link or Playlist Editor (Also don't forget to unpublish specific field you doesn't want)
image
image

Config , Location of a XML file with flashvars, All of the flashvars can also be listed in an XML file and then fed to the player with a single flashvars, Options set in the embed code will overwrite those in the config XML.

image
image

Facebook embed videoplayer (Load Meta Tag in HTML Head).
This allow sharing the videoplayer on Facebook, this working with Sharing and Facebook Plugin. For that you will have to set a default thumbnail field then the second step is getting your website approved for video embeds with Facebook. That can be done by filling out this form.

image

Here’s how a video player will look in the news feed of a person who shared it: Clicking the thumbnail will replace the description with your actual videoplayer, so people can watch your video inline.

image
image

Debug , If you're having issues with a JW player compil by yourself, you should enable debugging in the JW Player. This can be done by right-clicking on any player and then clicking on 'Debugging to…'. Repeating this process will cycle through the list of available debugging options: none, trace - logs debugger output to the flash debug log. arthropod - Arthropod is a handy Adobe Air application that we often use to look at debugging output.

image
image
Admin parameters for allow or not user choice for his own Skin (Also don't forget to unpublish specific field you doesn't want)
image
image

NEW !! Javascript Events, Allows inline setup of JavaScripts for player events, e.g. when you want to do something when the player stops.

{ onComplete: function() { alert("the video is finished!"); } }

The events block allows you to respond on player events in JavaScript. It's a short, powerful way to add player - pager interactivity.

http://www.longtailvideo.com/support/jw-player/jw-player-for-flash-v5/12540/javascript-api-reference#Events

image
image

Extra JS , Extra Javascript to Load, this can be useful for Extra plugin features.

image
image

Preview Admin interface

CB Player
CB Player Advanced

image

imageimageimageimageimageimageimage

XML Longtail Video Skin

CB Player
image
CB Player Advanced
image

XML Longtail skin support, only with JW 5.x. - Flash and HTML5 Mode

64 XML Longtail Skin Support.

XML-based skinning model - No need for Flash CS4 to build skins. If you can create an XML file and images, then you can create a skin.

beelden bekle-xml bluemetal-xml classic-xml five-xml grungetape-xml icecreamsneaka-xml kleur-xml lulu-xml modieus-xml nacht-xml playcasso-xml polishedmetal-xml schoon-xml snel-xml glow-xml cassette-xml chrome-xml darksunset-xml eleganttwilight-xml grol-xml nexus-xml iskin-xml niion-xml norden-xml rana-xml rime-xml selena-xml simplicity-xml skewd-xml tiby-xml trekkie-xml videosmartclassic-xml whotube-xml xero-xml glatt-xml metall-xml jump-xml sea-xml spirit-xml sun-xml witch-xml stijl-xml simple2-xml carbon-xml copper-xml facebook-xml graphite-xml lionslight-xml mare-xml moderngreen-xml nature01-xml plexi-xml rowafed-xml sbl-xml vector01-xml anoto-xml etv-xml nemesis-xml newtube-xml solidgold-xml minima-xml

 

SWF Longtail Video Skin

CB Player
image
CB Player Advanced
image

30 SWF Longtail Skin Support - Flash Only

simple 3dpixelstyle atomicred bekle bluemetal chelseaskin comet controlpanel dangdang fashion festival five1 grungetape icecreamsneaka kleur magma metarby10 modieus nacht neon pearlized pixelize playcasso schoon seawave silverywhite snel stijl traganja default-4 default-5

XML FlashSkins Skin

CB Player
image
CB Player Advanced
image

XML FlashSkins skin support, only with JW 5.x. - Flash and HTML5 Mode

10 XML FlashSkin Skin Support

fs28-xml fs29-xml fs31-xml fs33-xml fs33aqua-xml fs34-xml fs35-xml fs36-xml fs37-xml fs38-xml

XML Skye Media Skin

CB Player
image
CB Player Advanced
image

XML Skye Media skin support, only with JW 5.x. - Flash and HTML5 Mode

10 XML Skye Media Skin Support

aero-xml alien-xml darkrv5-xml lava-xml lightrv5-xml metal-xml minimal-xml ruby-xml slim-xml smooth-xml

Layout and Color

Name
CB Player
CB Player Advanced
Size Of the Player
image
image
Height of the player
image
image
Width of the player
image
image
Playlist Position (None, Top, Bottom, Right, Left, Over)
image
image
Control Bar Position (None, Bottom, Top, Right, Over)
image
image
Control Bar idlehide (If controlbar.position is set to over, this option determines whether the controlbar stays hidden when the player is paused or stopped.)
image
image
NEW !! Control Bar force next prev (Config option to allow users to force the next/prev buttons even if the playlist is visible.)
image
image
Display show mute (Shows a mute icon in the player's display window while the player is playing. Disabled by default.)
image
image
Dock (Set this to true to show the dock with large buttons in the top right of the player.)
image
image
Admin parameters for allow or not user choice for his own Skin (Also don't forget to unpublish specific field you doesn't want)
image
image
Color (Flash Only)
Background color
image
image
Frontcolor
image
image
Lighcolor
image
image
Screencolor
image
image
Transparence (Transparent / Opaque)
image
image
Icons (Hide or not the play button)
image
image

Logo : Licensee Only

Name
CB Player
CB Player Advanced
Logo (Location of an external jpg, png or gif image to show in a corner of the display.), JW 5.x Licensed players only,
image
image
Logo.link, JW 5.x Licensed players only, link to direct to when the watermark image is clicked on.
image
image
Logo.hide, JW 5.x Licensed players only, When set to yes, the logo will auto-hide.
image
image
Logo.timeout, JW 5.x: Licensed players only , When logo.hide is set to true, this option sets the number of seconds the logo is visible after it appears.
image
image
Logo.position, JW 5.x Licensed players only, The corner in which to display the logo.
image
image
Logo.linktarget, JW 5.x Licensed players only, Browserframe where link from the Logo are opened in. Some possibilities are '_self' (same frame) or '_blank' (new browserwindow) or '_top' or '_parent'.
image
image
Logo.margin, JW 5.x Licensed players only, The distance of the logo, in pixels from the sides of the player.
image
image
Logo.over, JW 5.x Licensed players only, The alpha transparency of the logo on mouseover. Can be a decimal number from 0 to 1.
image
image
Logo.out, JW 5.x Licensed players only, The default alpha transparency of the logo when not moused over. Can be a decimal number from 0 to 1.
image
image
abouttext, JW 5.x Licensed players only, The text that goes between 'About' and '...' in the right-click menu. If it is not set, no menu item will appear.
image
image
aboutlink, The URL that will be opened (in a new window) when a user clicks on the about text. If it is not set, clicking on the about text will not have any effect.
image
image
Name
CB Player
CB Player Advanced
Auto Start (Choose Automatically start the player on load)
image
image
Bufferlength (Number of seconds of the file that has to be loaded before starting.)
image
image
Display Title (Print the title of a video in the display, note this is new and for now this only work with skin disable), Note : JW 5.x Version, Currently not implemented.
image
image
Display Click (What to do when one clicks the display. Can be play, link, fullscreen, none, mute, next. When set to none, the handcursor is also not shown).
image
image
Mute (the sounds on startup. Is saved in a cookie. )
image
image
Link Target (Browserframe where link from the display are opened in. Some possibilities are '_self' (same frame) or '_blank' (new browserwindow)).
image
image
Repeat (None / List / Always / Single)
image
image
Resizing (Resize or not to fill the entire canvas)
image
image
Shuffle (Shuffle playback of playlist items)
image
image
Smoothing (Setting to get performance improvements with old computers / big files)
image
image
Stretching (Defines how to resize images in the display)
image
image
Volume (Startup volume of the player)
image
image

Extra Flashvars , With this new features you can add with a simple syntax some flashvars not yet implement, you just have to list them and use a & to separate them, like this : flashvar1=value&flashvar2=value&flashvar3=value.

image
image
CB Player
image
CB Player Advanced
image

Pop-Up Player - Flash Only (Windows, Highslide), Flash and HTML5 (JWBox), You can activate or not a Pop-Up Player, it will appear under the player of the user, by a text or an image or both or replace the player, Pop Up Player have a lot of new control :

  • Size, height, width configurable.
  • Image, Text or both link.
  • Overide Player with image, Text or both link
  • Highslide Effect. (a Highslide plugin must be install, we valid this with Core Design Scriptegrator plugin from Joomla on the JED)
  • JWBox (Lightbox) Effect.
  • Autedetect or not Jquery load for JWBox.
  • Load CSS or not for JWBox.

Preview Pop-Up Player

image

Preview JW Box Pop-Up Player

image

Preview Highslide Pop-Up Player

image

Sharing

CB Player
image
CB Player Advanced
image

Sharing V3, This plugin adds sharing functionalities to the player. Either through the dock or through the controlbar, the plugin offers links to two screens:

  • In the embed screen, an embed code for the specific video can be copy-pasted.
  • In the share screen, a link to thesite for this specific video can be copy-pasted. This screen also offers shortcuts for posting this link to: Twitter, Facebook, Myspace, An email message
  • Sharing Plugin supports the JW Player v5 Flash and HTML5, Skinning, and Playlists.
  • Facebook embed videoplayer feature.

JW Player™ Compatibility Version 1 : JW4 - Flash, JW5 - Flash
JW Player™ Compatibility Version 2 : JW5 - Flash
JW Player™ Compatibility Version 3: JW5 - Flash and HTML5
Last Updated: 7/14/11
Version: 1.0, 2.0, 3.0
Non-Commercial Use: Free
Commercial Use: Starting at €9

image
Embed Screen
image
Share Screen
image
Embed + Share Screen
image

Dabber Plugin

CB Player
image
CB Player Advanced
image

Dabber Plugin (The Grid, Carousel, Basic), The Grid Plugin, Dabber Basic Plugin, Dabber Carousel Plugin are different 3D playlist for displaying videos, complete with fly-in effects and navigation that follows the viewer's mouse cursor. Thumbnails are automatically grabbed from the regular playlist and rendered inside the plugin, requiring no extra setup. Those plugin are especially useful for creating an easy overview of large amounts of content.

We have group those plugins together as they used same flashvars and can’t be set on together, you have to choose one of them.

The Grid Version 1 :
JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
The Grid Version 2, Basic, Carousel :
JW Player™ Compatibility : JW5 - Flash
Last Updated: 11/9/10
Version: 2.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €14 each one.
image
image
The Grid
Dabber basic
image
Dabber Carousel

Viral

CB Player
image
CB Player Advanced
image

Viral 2.0, a video distribution plugin, supports four main functions: embed, link, Infos, and recommendations. It unobtrusively allows the user to share the video they are watching and see recommended videos from the publisher.

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 8/18/09
Version: 2.0
Non-Commercial Use: Free
Commercial Use: Starting at €9
image

Viral Link

Viral Embed

image

Viral Recommendations

image

Viral Info

image

Viral Dock

image

Facebook-it

CB Player
image
CB Player Advanced
image

Facebook It , The Facebook It plugin allows your users to post your videos on the Facebook social network. It's a great way to have users share your videos online and broaden their distribution. The user just clicks on the Facebook icon in the dock, clicks Post, and then logs into their Facebook account. If the user doesn't have an account, then they can easily create one. also include Facebook embed videoplayer feature.


JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 10/21/09
Version: 1.0
Non-Commercial Use: Free
Commercial Use: Starting at €9
image
image

Tweet-It

CB Player
image
CB Player Advanced
image

Tweet It , The Tweet It plugin allows your users to post your videos on the Twitter social network. It's a great way to have users share your videos online and broaden their distribution. The user just clicks on the Twitter icon in the dock, clicks Post, and then logs into their Twitter account. If the user doesn't have an account, then they can easily create one.

JW Player™ Compatibility : JW5 - Flash
Last Updated: 1/5/10
Version: 1.0
Non-Commercial Use: Free
Commercial Use: Starting at €9

image
image

Google Analytics Pro

CB Player
image
CB Player Advanced
image

Google Analytics Pro, This plugin for the JW Player is designed to help you understand how well your video content is performing online. It takes advantage of Google's new Flash API for Analytics so you can track events within the JW Player itself.

The tracking of events (which includes allowing you to access information about not only what videos are watched, but how long users watch each video), aggregates it, and passes along the relevant information for easy and concise tracking within Google Analytics.

Note: Version 2 of GA Pro is a JavaScript Version of the Plugin, compatible with both HTML5 and Flash Modes NEW !!

Documentation From Longtail : (Quick Start Guide) on Google Analytics Pro and then a longer (User Guide) (both are PDFs).

JW Player™ Compatibility 1.0: JW4 - Flash, JW5 - Flash
JW Player™ Compatibility 2.0: JW5 - Flash, JW5 - HTML5 NEW !!
Last Updated: 4/26/11
Version: 2.0
Non-Commercial Use: Free
Commercial Use: Starting at €14

image

image

Flow

CB Player
image
CB Player Advanced
image

Flow V1 and V2, The Flow plugin provides slick, 3D animation playlist effects for users to flip through their playlist items. The plugin automatically grabs thumbnail images from any playlist and renders them three-dimensionally in a row. Users can navigate through the playlist by clicking on a thumbnail image or using the left/right arrow keys and space bar to select items.

Note: The Flow Plugin Now Supports the JW Player OVA Plugin and both Flash and HTML5 Modes!

JW Player™ Compatibility 1.0: JW4 - Flash, JW5 - Flash
JW Player™ Compatibility 2.0: JW5 - Flash, JW5 - HTML5
Last Updated: 7/19/11
Version: 2.0
Non-Commercial Use: Free
Commercial Use: Starting at €9

image
image

Tipjar

CB Player
image
CB Player Advanced
image

TipJar, allows you to receive donations on your Paypal account. A popup window with a Donate button is shown when the video is completed, when the video is paused, or both. You can define your own title and text or even skin the popup window completely. If you want, you can also trigger the opening of the popup window through other plugins.

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 11/14/08
Version: 1.0
Non-Commercial Use: Free
Commercial Use: Free
image
image

Revolt

CB Player
image
CB Player Advanced
image

Revolt, This plugin displays some cool visualizations for audio file playback. (Be careful it will display a black screen if the file stream is not an audio file !!)

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 9/19/08
Version: 1.0
Non-Commercial Use: Free
Commercial Use: Free

image
image

Extra Plugins

CB Player
image
CB Player Advanced
image
Plugins - Flash - HTML5 plugin has been released since 5.5 version of JW Player, in fact only the javascript mechanism has been released, now all the plugins have to be update for JS version, this will take sometimes

Multiple plugin on same player
(viral, tipjar, adsolution, Google Analytics Pro, Sharing, Revolt, Flow, Dabber Plugin, Facebook)

Extra Plugin , With this new features you can add with a simple syntax some plugins not yet implement, you just have to list them and use a comma to separate them, like this : plugin1,plugin2,plugin3.
Note : as some plugins need extra flashvars and / or extra JS files this is relate to Extra Flashvars and Extra JS features

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash, JW5 - HTML5
Last Updated: 7/16/10
Non-Commercial Use: Free
Commercial Use: Free
image

AdSolution

CB Player
image
CB Player Advanced
image

LongTail's AdSolution, It is LongTail Video's self service Video Advertising Network used by thousands of websites which serves hundreds of millions of Video Ads monthly. Websites that use the CB Player can sign up and start running Video Ads in minutes.

Why Signup with LongTail Video's AdSolution?

  • Easy to Install - Start running Ads in minutes
  • 100% Coverage - We have Advertisers for every country
  • Online Reporting - Access Stats 24x7
  • Support for Drupal, Wordpress, Joomla & Bits on the Run

Needs special registration here : AdSolution.longtailvideo.com

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 3/9/09
Version: 1.0
Non-Commercial Use: Free
Commercial Use: Free

image

CB Player Pre-Roll

image

CB Player Mid-Roll

image

CB Player Advanced Pre-Roll

image

CB Player Advanced Mid-Roll

image

AdSolution Premium

CB Player
image
CB Player Advanced
image

Premium Ads, LongTail's AdSolution includes Premium Ads which are advertisements from high quality advertisers and Ad Networks that significantly increase your revenue.   Sample Premium Ad Networks include Google's AdSense for Video, Scanscout, and Yume.     

Many Premium Ad Networks have minimum volume requirements in order to directly work with them.  LongTail's AdSolution provides publishers, who do not meet those minimum volume requirements, a way to work with Premium Ad Networks. 

Premium Ads are delivered within all ad units - Pre-rolls, Overlay Ads, and Post-Rolls.

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 3/9/09
Version: 1.0
Non-Commercial Use: Free
Commercial Use: Free

image
image

OVA

CB Player
image
CB Player Advanced
image

OVA ,The Open Video Ads (OVA) plugin effectively turns the JW Player into an IAB compliant, advertising enabled video player. Through the use of the OVA plugin, linear (video and SWF) and non-linear (overlay) ads along with companion banners can be delivered from any VAST 1.0 or 2.0 compliant ad server to the JW Player.

Check out all the features here.
Features :

  • VAST-compliant ad server communication
  • Support for a wide array of ad units
  • VAST-compliant tracking of video ad performance
  • Flexible configuration & scheduling options
  • Overlay advertising using Images, Flash, Text or HTML
  • Playback using HTTP and RTMP protocols

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 7/30/10
Version: 1.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €199

image
image
image

Adtonomy Text Ads

CB Player
image
CB Player Advanced
image

Adtonomy Text Ads, LongTail Video's Adtonomy Text Ads Plugin lets you run your own text ads within the JW FLV Player. Serve ads throughout your videos. As the name suggests, Adtonomy Text Ads is completely self-serve and customizable, so you can create your own tracking mechanisms, alter ad functionality, design advanced targeting configurations and much more.

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 7/30/09
Version: 1.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €99

image
image

Adtonomy Video Ads

CB Player
image
CB Player Advanced
image

Adtonomy Video Ads, LongTail Video's Adtonomy Plugin lets you run your own FLV advertisements within the JW FLV Player. Serve ads before, after or in the middle of your videos as well as in between playlist items. As the name suggests, Adtonomy is completely self-serve and customizable, so you can create your own tracking mechanisms, alter ad functionality, design advanced targeting configurations and much more.

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 3/2/09
Version: 1.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €99

image
image

Adtonomy Image Ads

CB Player
image
CB Player Advanced
image

Adtonomy Image Ads, LongTail Video's Adtonomy Image Plugin lets you run your own 300x250 image advertisements within the JW Player. As the name suggests, Adtonomy Image Ads is a completely self-serve and customizable advertising plugin. Serve ads before your video starts, after your video finishes, or when the player is paused. Note: this plugin supports both Flash and HTML5 modes which means you can display ads on multi-devices including the iphone, and ipad!

JW Player™ Compatibility : JW5 - Flash and HTML5
Last Updated: 6/8/11
Version: 1.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €99

image
image

Google Interactive Media Ads

CB Player
image
CB Player Advanced
image

The Google Interactive Media Ads (IMA) plugin serves DoubleClick In-Stream Ads in your JW Player. Google Interactive Media Ads empowers your operations team with the power of DART targeting and reporting to better execute the most complex advertising campaigns. Sophisticated capabilities let you integrate non-traditional Ad events like bugs and overlays, or you can pair video Ads with companion rich media Ads, generating greater impact and providing advertisers with improved brand awareness. The Google IMA plugin is intended for use by DoubleClick For Publishers (DFP) account holders. To use this plugin, you must have a DoubleClick In-Stream account.

Note: This plugin supports the latest Google IMA SDK (Flash AS3 SDK), Google AdSense for Video, and VAST 2.0 Ad Serving.
Note: Supports HTML5 mode as of JW Player Version 5.8
Note: To use this Plugin, you have to configure Extra Plugin, Extra Flashvars fields.

JW Player™ Compatibility : JW5 - Flash, JW5 - HTML5
Last Updated: 11/17/10
Version: 1.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €399/Year

image

YuMe

CB Player
image
CB Player Advanced
image

YuMe, YuMe brings order to the current chaos in online video. As the first video monetization solution created and optimized for broadband video, YuMe's innovative ad serving and ad management platform provides hundreds of publishers with the ability to insert the right ad into the right video content at the right time, then monitor and optimize performance to ensure maximum monetization.
NOTE: To use this Plugin, you have to configure Extra Plugin, Extra Flashvars, Extra Js fields.

JW Player™ Compatibility : JW4 - Flash, JW5 - HTML5
Last Updated: 1/21/09
Version: 1.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €399/Year

image

ScanScout

CB Player
image
CB Player Advanced
image

ScanScout, ScanScout is the leading in-stream video ad network powered by sophisticated filtering, optimization and targeting technology. In addition to providing a pre-roll ad source, the ScanScout network provides online video publishers new ways of generating significant revenue by serving ads within the video stream. The overlay/ticker ad unit is non-intrusive, user-friendly and user initiated.
NOTE: To use this Plugin, you have to configure Extra Plugin, Extra Flashvars fields.

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 4/7/09
Version: 1.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €199/Year

image

SpotXchange

CB Player
image
CB Player Advanced
image

SpotXchange, SpotXchange empowers publishers to access a variety of advertisers -- brand marketers, local advertisers, etailers; and a deep pool of video ad types -- InStream, video overlays (InnerStream), and InGame video ads. Self-service publisher tools allow real-time access to stats and ability to call ads just-in-time and configure them on the fly.
NOTE: To use this Plugin, you have to configure Extra Plugin, Extra Flashvars fields.

JW Player™ Compatibility : JW4 - Flash
Last Updated: 12/18/08
Version: 1.0
Non-Commercial Use: Not Available
Commercial Use: Starting at €399/Year

image

Tremor Media

CB Player
image
CB Player Advanced
image

Tremor Media Plugin , Tremor Media, the leader in online video, provides brand advertisers with in-banner and in-stream video advertising opportunities on top-tier publisher sites. In addition, Tremor Media provides publishers with a full suite of products and services to monetize streaming video and maximize ROI with full flexibility and control via our proprietary Acudeo technology.

The Acudeo video monetization platform is fully integrated with the JW media player and all major 3rd party ad servers enabling publishers to quickly access its powerful benefits. Publishers can schedule and dynamically deliver in-stream video and overlay ads with the same ease as with display advertising through the Acudeo console. With Acudeo, publishers can earn revenue from multiple ad sources, including Tremor Media's leading video ad network, maximizing ad delivery opportunities and revenue.

Prior to purchasing a license, please confirm you are signed up as a publisher in the Tremor Media Network. For more information, please go to http://www.tremormedia.com/contact/publishers-contact-form/
NOTE: To use this Plugin, you have to configure Extra Plugin, Extra Flashvars fields.

JW Player™ Compatibility : JW4 - Flash, JW5 - Flash
Last Updated: 5/26/10
Version: 1.1
Non-Commercial Use: Not Available
Commercial Use: Starting at €199/Year

image
Name
CB Player
CB Player Advanced
Help and Support

NEW !! Premium support : Priority Professional Support, Response times have priority over Advanced and Basic users. Profile and Forum Badge.

image
image
In option,
Starting price 19€/Year
Advanced support : Priority Support, Response times have priority over Basic users. Profile and Forum Badge.
image
image
image
Forum
image
image
Documentation (PDF)
image
image
Plugin is validate as XHTML 1.0 Transitional!
Valid XHTML 1.0 Transitional
Valid XHTML 1.0 Transitional
Plugin is validate as CSS level 2.1 !
No CSS
CSS Valide !
GPLv3
image
image
Updates
Notification of new version available (Mailing List)
image
image
Upgrade for next Version
image
image Require active subscription
Multiple License Resell, 1,2,10 and 50 Website
image
image

License-holders can download an unbranded player with their Licence number and replace themself the player in the directory of CB Player Plugin. (Please Read the FAQ for more explanation)

JW FLV Media Player 5.x Licence , Unbranded player !

image
image Unbranded Player only available with a License,
starting price 59€
Upgrade To another Plan
image
image
Downgrade To another Plan
image
image
Last Updated on Sunday, 22 April 2012 11:34  
Banner

Testimonials

Great tool, brilliant support, I've been looking around everywhere for a simple plugin to embed my YouTube playlists in a sleek way.. It seem...

zee2011
Feb 20, 2012

Review Our Product

"If you use JW Player Module or Plugin Advanced, please Post a Rating and a Review at the Joomla! Extensions Directory."
joomla